Nanjing Jingyun Ship Fitting Co., Ltd.
Main products:Ship fittings,marine equipment,Marine door,Marine window,Mooring equipment
Products
Contact Us
  • Contact Person : Ms. Zhang Joyce
  • Company Name : Nanjing Jingyun Ship Fitting Co., Ltd.
  • Tel : 86-025-57401138
  • Fax : 86-025-57401338
  • Address : Jiangsu,nanjing,Shipping accessories District No.1,Town,Jingqiao,County,Lishui,Nanjing
  • Country/Region : China
  • Zip : 211217

oridinary rectangular window(square)

oridinary rectangular window(square)
Product Detailed
-meet SOLAS ,ISO 9001-2008 -weathertight and antirust -can provide: ABS GL LR KR NK CCS DNV BV --fast delivery -customized

TYPE

type

name

Material of main frame

BH

electrical heating wheelhouse fixed window(bolted)

aluminum

BN

tempering glass wheelhouse fixed window(bolted)

WH

electrical heating wheelhouse fixed window(welded)

stleel

WN

tempering glass wheelhouse fixed window (welded)

Sturctuire ,main frame of type WH,WN

section of main spare parts

Requirement

1 the main material of spare parts meet requirement as follow

Spare parts

Name of material

Main frame

Aluminum alloy

steel

Glass flat

Aluminum alloy

copper alloy

glass

Safety tempering glass

electrically heated glass

Seal ring

polychloroprene

sunk screw

Stainless steel

2surface of aluminum spare parts will carry out anodic oxidation treatment

3surface of steel spare parts will be galvanized

4there are protective films on both size of glasses

5 surface roughness of main frame and glass flat less than 12.5um.

6the edge of heated window will take protective measures( see picture, the thickness won’t more than 2mm)

7 In the waters outside of the polar areas(Common wind speed and standard atmospheric pressure20/65),the power load of glass demisting defrost equipment meet the requirement as follow

Power load

outdoor temperature

min

max

7

9

-12centigrade

12

15

-28centigrade

17

21

-40centigrade

8 the heated glass is equipped with over heating protection system

ways of test

1Blunt water experiment

Installing the window ,use nozzle(dia>12.5mm) carry out blunt water test with at least 250kPa,the distance between nozzle and porthole should be less than 1.5m. After testing ,there should be no drop of water or any leakage phenomenon on the testing part.

2The performance test, mechanical strength test

Package

The window can be packed individually with calp box or wooden box.And should be clamped with correct methods, equipped with soft cushion package materials

Delivery

The windows with package can be delivered by any methods ,but should take the necessary measures avoiding vibration, .pressure and rain

Update Date:2012-04-09 10:05:19

oridinary rectangular window(square)



Copyright Notice @ 2008-2022 ECVERY Limited and/or its subsidiaries and licensors. All rights reserved.